How to Prepare a Construction Risk Assessment
Be specific about the task
Start by defining the activity clearly: what is being done, where, with what equipment, and by whom. Risk assessments that try to cover 'general construction' tend to miss the significant hazards of the work actually planned.
Identify the significant hazards
Focus on the hazards that could realistically cause harm: falls from height, moving plant, manual handling, dust, noise, services, excavations and hazardous substances. Walk the area or talk to the people doing the work. They often know where the real risks are.
Decide on controls using the hierarchy
Work through the hierarchy of control: can the hazard be eliminated or the work done differently? If not, use engineering controls, safe systems of work and supervision, with PPE as the last line of defence. Record controls clearly enough that a supervisor could check they are in place.
Communicate and review
A risk assessment only works if the people doing the job understand it. Brief it before work starts, and review it when the method, location or team changes, or after an incident or near miss.
Thames Gateway Health & Safety prepares and reviews construction risk assessments and RAMS for contractors across Essex, Thurrock and London.
Need practical H&S support?
Discuss Your Requirements with our construction health and safety consultants.
Book a Free Consultation